Every year on December 22, on the day of the winter solstice, Energy Day is celebrated.
Every year on December 22, on the day of the winter solstice in Ukraine, Energy Day is celebrated. It is symbolic that the holiday coincides with the shortest day and the longest night of the year, when the work of power engineers is most noticeable.

Ukraine has always played a significant role in the development and management of the fuel and energy sector. The latest achievements in this industry were developed and implemented in the country. Here are some milestones in the formation and development of electricity in Ukraine.

1878 – for the first time in Kiev installed electric machine and 4 arc electric lamps.

1890 – launch of the first power plants in Ukraine (Kyiv, Konstantinovka, Ekaterinoslav, Lviv)

In 1913, the capacity of Ukrainian power plants was 304.3 thousand. kW.

1920 – adoption of the GOELRO plan, which provided for the construction of 4 thermal power plants in the Donbass and Dneproges.

1935 - creation of the Donbas, Dnieper and Kharkiv energy systems.

1961 - the first Ukrainian power line-330 kV Kremenchug-Cherkasy-Kyiv was built.

In 1962, the Ministry of Energy and Electrification of Ukraine was established. The world’s first direct current transmission line Volgograd-Donbass was built with a voltage of 800 kV and a length of 473 km.

1965 - about 1,600 small hydroelectric power plants operate in Ukraine. An integrated energy system of Ukraine has been formed.

1970 - the first in the USSR Kiev hydro-storage power plant with a capacity of 225 MW was put into operation.

1975 – construction of the cascade of Dnieper hydroelectric power plants was completed. The construction of the South Ukrainian energy complex as part of nuclear power plants, hydroelectric power plants, and hydroelectric power plants has begun.

1991 - the total length of power grids of Ukraine exceeded 1 million km.

1993 - Decree of the President of Ukraine No. 522/93 established Energy Day.

1995 - construction of the largest Zaporizhia nuclear power plant in Europe with a capacity of 6 million was completed. kW.

In 1997, the Law of Ukraine “On Electricity” was adopted.

In 2000, the Ministry of Fuel and Energy of Ukraine was established.

Ukraine is proud of its energy past and confident in its energy prospects.